Wilmar Group, Indonesien
Task
Installations for building infrastructure, including the following:
- Lightning protection and grounding
- Light installation
- Distribution cabinets for building infrastructure (high and extra low voltage)
In parallel to electrical process planning, the complete power supply was planned ─ from the medium-voltage system and transformers to the low-voltage main distributors.
In addition to the almost complete electrical planning exercise, all switch cabinets (medium and low voltage), transformers and
compensation equipment as well as the required process installation material were able to be supplied.
The overall electrical planning package with material supply was rounded off with the end-to-end installation.
Employees Bühler+Scherler AG
Zoran Dukic
2018 - 2021
Contact
-