In advance, we perform meticulous virtual collision checks and troubleshooting. Where do lines interfere? Where do work processes need to be improved? Such questions are clarified by Bühler + Scherler digitally in advance.
What is the aim here? To increase the quality and accuracy of design and construction. To greatly reduce the effective installation time compared with conventional planning and also significantly reduce costs. As a result, data is available for the entire lifecycle of a building.
This information can then be easily used, for example, for operations, subsequent maintenance or troubleshooting.