Associated Mills Limited, Papua New Guinea
Task
Electrical planning of electrical process installations and building infrastructure installations with the following:
- Lightning protection and grounding
- Light installation
- Distribution cabinets for building infrastructure (high and extra low voltage)
In parallel to electrical process planning, the complete power supply was planned ─ from the medium-voltage system and transformers to the low-voltage main distributors. The entire plant is electrically equipped with a 100% backup system by way of 4 diesel generators with a capacity of 6 MVA.
In addition to the almost complete electrical planning exercise, all switch cabinets (medium voltage), transformers and required process installation material were able to be supplied.
Employees Bühler+Scherler AG
Erwin Rüdisühli
2019 - 2022